Answers That Go Beyond the Brochure.
Everything clients typically want to know before partnering with DPS — our services, coverage, equipment, methodology, and what makes us fundamentally different from traditional engineering contractors.
The DPS Fundamentals
Who we are, where we’re based, and the core model behind every project we deliver.
What We Actually Deliver
From feasibility studies to full system commissioning — here’s how our service scope breaks down in practice.
Equal Depth Across Food & Beverage
Roughly a 50/50 split in workload — and a dedicated subject matter expert for each side of the business.
The DPS-Branded Product Line
Tanks, CIP systems, tumblers, and retorts — seamlessly integrated with the projects we deliver.
Who We Work Best With
We pre-screen every potential client. Here’s what we look for — and what typical engagements look like.
We are currently leading the design and installation of a brand-new beverage co-packing facility with highly flexible production and repacking capabilities. The scope includes the syrup room, boiler systems, air compressors, cooling towers, and all plant utilities. Year-one capacity is targeted at twenty million cases, scaling to eighty million at full production. Beyond engineering, DPS is deeply involved in shaping the client’s business model itself to ensure the facility is profitable from year one.
Why DPS Is Fundamentally Different
How we think — about clients, contractors, capital projects, and the ethical line we refuse to cross.
Yes. A client planned to invest three million dollars in capacity expansion to gain roughly twenty percent throughput. Our analysis showed the real bottleneck was in the PLC programming. With the client’s approval, we adjusted the program and achieved a thirty percent throughput lift at no charge. They later awarded us a six million dollar equipment relocation project in Texas. Long-term trust, working exactly as advertised.
Let’s Get into the Specifics of Your Project.
Every situation is different — and the best answers come from a real conversation about your goals, timeline, and operational constraints. Our team is ready to listen first and recommend second.
