Sanitary Systems, Configured to Fit Your Line.
DPS designs and manufactures stainless steel process equipment for automated cleaning, batch cooking, bulk storage, mixing, and product marination — engineered for sanitary production where repeatability, cleanability, and uptime are non-negotiable.
Four Platforms. One Standardized Equipment Package.
Each platform can be configured to match required capacity, agitation, utilities, and controls — so new and existing lines can be supported with a consistent, controls-ready architecture.
CIP Skids
Modular clean-in-place systems for automated cleaning of process vessels, lines, and filling equipment.
Kettles
Jacketed kettles for batch heating, cooking, and mixing of liquid and semi-liquid products.
Storage & Mix Tanks
Vertical stainless tanks for storage, staging, and mixing of ingredients and finished product.
Marination Tumblers
Vacuum-capable tumblers for consistent flavor distribution and product conditioning.
Cip Skids — Automated Sanitary Cleaning.
Modular clean-in-place systems designed for automated cleaning of process vessels, lines, and filling equipment. Configurable tank, circuit, and valve packages support a wide range of sanitary cleaning applications without compromising on uptime or repeatability.
Jacketed Kettles for Recipe-Driven Batching.
Jacketed kettles for batch heating, cooking, and mixing of liquid and semi-liquid products. Mixing, control, and cooling options allow each unit to be tailored to specific recipes and process requirements — from sauces and bases to dairy and soup stocks.
Storage & Mix Tanks — Scaled to the Facility.
Vertical stainless tanks for storage, staging, and mixing of ingredients and finished product. Multiple agitation and certification options support both general service and high-sanitary applications across food, beverage, and dairy environments.
Marination Tumblers for Protein & Prepared Food.
Marination tumblers designed for consistent flavor distribution and product conditioning. Configurable vacuum, cooling, and material-handling accessories support a range of protein and prepared-food applications — from whole-muscle injection recipes to marinade-forward finished products.
Standards That Ship with Every Platform.
Every DPS equipment package is engineered around a shared set of sanitary baselines — so procurement, quality, and operations teams can standardize specification and reduce approval cycles.
NSF & UL Compliant Designs
Every platform is engineered to NSF sanitary and UL electrical standards as a baseline — not an option.
18 – 20 Week Typical Delivery
Standardized platforms and configurable options keep lead times predictable and schedules honest.
FEL-2 Support Included
Front-End Loading engineering support available on qualifying projects — no separate engagement required.
Advanced Automation Ready
Controls-ready architectures with advanced automation and CIP options for seamless plant integration.
Start with a Platform. Finish with Your Line.
Tell us what you’re producing, how much, and under what conditions — we’ll scope a configured equipment package with capacity, controls, and sanitary certifications to match.
