Different recipes
Sugar, alcohol, ingredients and product properties can change carbonation behavior. Specify the accepted finished-product condition and the actual recipe range rather than borrowing water-only assumptions.
Compare cooling, gas dosing, pressure, measurement and filler interfaces for the actual beverage and packaging range.

Start with the business outcome
A carbonation problem may appear at the filler while originating in product temperature, pressure behavior, gas measurement or line control. DPS can coordinate the specialist carbonation package, utilities, routing and filling interfaces. The business case needs accepted packaged output and measured gas / resource costs, not a universal carbonation setting or assumed CO2 saving.
The specialist carbonator and filler suppliers establish equipment limits and trials. Qualified site teams define gas quality, pressure-system requirements and the product acceptance basis. DPS integration is not a claim to manufacture every carbonator or beverage filler.

Sugar, alcohol, ingredients and product properties can change carbonation behavior. Specify the accepted finished-product condition and the actual recipe range rather than borrowing water-only assumptions.
Container formats, filler operating range and product conditions must fit together. A good skid outlet sample does not establish accepted filled-pack performance.
Define product temperature, pressure, flow variation and gas / utility supply. Investigate changing load and start-stop behavior as well as steady operation.
Trace product and filler events with synchronized measurements.
Obtain OEM requirements and the upstream / downstream operating envelopes.
Measure actual gas use and conforming baseline output before and after a qualified change.
Swipe horizontally to compare all columns ↔
| System | Operating duty | Relevant DPS guide | Confirm before purchase |
|---|---|---|---|
| Specialist carbonation / gas package | Meet the actual beverage and operating envelope. | Process engineering ↗ | OEM gas / liquid requirements, product trials and pressure duty. |
| Utility supply and return | Meet the duty where the process actually uses it. | Utility infrastructure ↗ | Peak overlap, recovery, quality, point-of-use conditions and isolation. |
| Instrumentation and controls | Execute the agreed sequence and record meaningful equipment states. | Automation & controls ↗ | I/O, alarms, recipe authority, backups and acceptance tests. |
| OEM and field interfaces | Connect the selected equipment to the existing operating train. | Installation & integration ↗ | Mechanical, electrical, software, site access and integrated acceptance. |
A product-quality problem can cross all three interfaces. Define which party measures each acceptance condition.
Swipe horizontally to compare all columns ↔
| Decision | What to compare | Acceptance evidence |
|---|---|---|
| Carbonation package | Recipe range, gas dosing, liquid conditions and turndown | OEM trials across required operating states. |
| Cooling interface | Actual product load, supply / return and recovery | Stable required product conditions at the package. |
| Filling interface | Format, speed, pressure behavior and stop / restart | Accepted filled packs rather than skid outlet alone. |
Swipe horizontally to compare all columns ↔
| Observed condition | Measure before design | DPS / team decision | Economic basis |
|---|---|---|---|
| Foaming / rejects | Track product and filler conditions. | Coordinate temperature / pressure / package response. | Accepted extra sales or verified reject costs, once. |
| Unstable start-stop duty | Log sequence and supply states. | Review controls and buffering. | Useful good output over the actual schedule. |
| High gas purchases | Reconcile purchased gas with matched good output. | Correct verified loss mechanisms. | Actual purchases avoided outside new-volume gas cost. |
| Cold-side limitation | Measure delivered cooling during demand. | Match carbonator and filler conditions. | Independent energy cost and useful capacity. |
Observe the real reject or stop event at both carbonator and filler. Separate unstable conditions, package issues and measurement error before selecting a replacement skid.
Specify the recipe / package range and qualified gas / product conditions before selecting the carbonation and filler packages. Include cooling, gas supply, installation and cleaning.
Compare proposals with the same product duty, supplier boundaries and acceptance basis. The amount below is a transparent planning example, not a market price range, supplier estimate or DPS quotation.
| Cost bucket | Assumed amount |
|---|---|
| Application engineering and supplier duty review | $36,000 |
| Defined equipment / instrumentation components | $129,000 |
| Mechanical and electrical field installation | $66,000 |
| Controls and interface development | $39,000 |
| Commissioning / agreed acceptance support | $18,000 |
| Training, documentation and handover | $12,000 |
| Defined project scope | $300,000 |
| Separate site / facility additions | $35,000 |
| Capital contingency (15%) | $50,250 |
| Separate one-time startup / shutdown cost | $25,000 |
| Incremental working capital | $10,000 |
| Total initial cash | $420,250 |
The defined scope assumes applicable freight, procurement charges and taxes are included in the owner’s estimate. Add missing civil, land / shell, OEM, environmental, validation and permitting costs explicitly. Site and field conditions, duty, production access and quoted supplier scope determine actual price. Financing is excluded.
Hypothetical screening case: 250 days × 0.4 equivalent useful hour/day × 1,800 accepted kg/h × 60% realization, capped at 120,000 kg incremental demand, gives 108,000 additional sold kg/year. Net price $2.5/kg less incremental variable cost $1.8/kg gives $0.7/kg contribution. Verified baseline purchase savings are $1,200, realized payroll savings $0, energy $10,000, cleaning resources $4,000 and maintenance $5,000 per year. Deduct $12,000 additional annual fixed cost. Baseline material here is purchased CO2 at unchanged accepted baseline output. Incremental product gas is already included in variable cost; only independent gas purchases avoided are counted as savings.
Calculated from these assumptions: steady annual net benefit $83,800; year-one net cash $50,270; cash payback Beyond 5 years; five-year NPV at 10% is −$133,064. Change the assumptions below to test a different case.
Replace the illustrative inputs with your own measured or quoted values. The five-year pre-tax model uses good kilograms, demand-capped contribution and separately verified baseline savings; it is not a project quotation.
All defaults are illustrative. The default case is an operating-plant improvement, not a greenfield quote. For a new operation, set baseline savings to zero and enter every additional operating and capital cost.
Includes contingency, startup and working capital
Incremental operating cash before tax
Includes year-one ramp assumption
At 10% annual discount
Net annual benefit ÷ initial cash
Net cumulative gain ÷ initial cash
Modeled incremental sales: 108,000 kg/year at $0.70/kg contribution. The base case does not recover the required discounted return within five years. Year-one net cash: $50,270.
Realization needed for the target operating payback
Not feasible
Demand, time, contribution or other cash benefits cannot meet the 4-year target under these assumptions.
CSV export is local. No inputs are submitted.
Swipe the chart to compare all five years ↔
Swipe horizontally to compare all columns ↔
| Year | Net cash | Cumulative cash | Discounted cash |
|---|---|---|---|
| Initial | −$420,250 | −$420,250 | −$420,250 |
| Year 1 | $50,270 | −$369,980 | $45,700 |
| Year 2 | $83,800 | −$286,180 | $69,256 |
| Year 3 | $83,800 | −$202,380 | $62,960 |
| Year 4 | $83,800 | −$118,580 | $57,237 |
| Year 5 | $83,800 | −$34,780 | $52,033 |
Swipe horizontally to compare all columns ↔
| Case | Annual benefit | NPV | Cash payback |
|---|---|---|---|
| Downside | $53,560 | −$315,125 | Beyond 5 years |
| Base | $83,800 | −$133,064 | Beyond 5 years |
| Upside | $100,600 | −$74,724 | 4.57 years |
Downside: installed and site costs +20%, realization ×0.75 and unit contribution reduced by 20% of its absolute value. Upside: realization ×1.15, capped at 100%, and unit contribution improved by 10% of its absolute value. The demand ceiling still applies.
Initial cash = (defined project scope + site additions) × (1 + contingency) + separate startup / shutdown cost + working capital. Contingency is conservatively treated as spent initially.
Sold incremental kg = min(days × recovered hours/day × constrained good kg/hour × realization, incremental demand). Contribution = sold incremental kg × (net price − incremental variable cost). New-volume labor, energy and packaging belong in that variable cost.
Baseline material benefit uses the verified percentage of actual purchases avoided at unchanged accepted baseline output. It is not a direct subtraction of two loss rates. Count a recovered kilogram once, either as its applicable cash saving or as incremental contribution.
Net annual benefit = contribution + independently realized baseline cash savings − added fixed operating cost. Year one scales gross benefits by the ramp factor while paying the full added fixed operating cost. Do not also count the same launch loss in the one-time startup amount.
Cash ROI = net annual benefit / initial cash. Five-year net ROI = (five-year cash inflows − initial cash) / initial cash. NPV = −initial cash + Σ cash flow(t)/(1 + discount rate)^t. Payback uses annual cash with linear interpolation within the recovery year. The threshold solver excludes terminal working-capital recovery.
This is a five-year screening horizon, not an asset’s entire life. No tax, debt, depreciation, grants, escalation, asset resale or additional replacement capital is modeled. Include recurring service costs in operating expense and use a detailed monthly budget for formal capital approval.
Defaults reproduce the main $1,200 gross CO2-purchase saving: 800 kg avoided × $1.50/kg. All added annual fixed cost is separate in the main $12,000 input.
Use representative products, measured constraints and a documented utility / cleaning envelope. Assign each supplier and owner interface.
Plan FAT / SAT, instruments, recipes, permissives, quality checks and upstream / downstream handshakes as appropriate to the scope.
After stabilization, compare matched products and operating conditions. Reconcile extra output with sales, and baseline savings with actual purchases, bills and payroll.

Published scope / project context
DPS publishes process engineering, configured equipment, controls and installation / integration services. The source links establish relevant scope. The amounts, time changes, resource reductions and returns here are original hypothetical inputs, not achieved DPS customer results.
Swipe horizontally to compare all columns ↔
| Decision | Targeted intervention | Broader replacement / new operation |
|---|---|---|
| Constraint | A measured gap can be corrected within retained assets. | The verified operating envelope cannot meet product, demand or reliability needs. |
| Cost scope | Include engineering, interfaces, shutdown, commissioning and retained-asset risk. | Include all new systems, site / facility work, OEMs, utilities, ramp and working capital. |
| Benefit | Only incremental contribution and genuinely avoided costs versus the current operation. | Demand-supported contribution less the full additional operating cost versus the agreed alternative. |
| Acceptance | Verify the changed duty and its effect on the complete line. | Verify the integrated new train and the owner’s readiness to operate. |
Prepare the information below, export the assumptions you have modeled, and discuss the unknowns with DPS. An unmeasured input is a question to resolve, not a reason to invent precision.
Checklist and model data stay in this browser until you choose to share them.
GEA’s package data lists product and utility conditions for its own mixing / carbonating equipment. It demonstrates why an OEM envelope is needed; those values are not universal carbonation settings and no DPS manufacturing or partnership claim is implied.
Guide assumptions reviewed on 26 October 2026. Qualified site / product teams establish regulatory and food-safety requirements; this guide does not prescribe a validated process.

Compare aseptic and hot-fill beverage concepts through product suitability, packaging, hygienic boundaries, utilities and the complete capital scope.

Define a food plant utility design basis using operating events, simultaneous peaks, supply conditions, future capacity and clear package interfaces.

Plan food processing and packaging as one path. Compare rates, batch presentation, buffers, interfaces and staged capacity before selecting equipment.