Soils and recipe families
Map fats, proteins, starches, sugars, particulates and product behavior to the equipment surfaces and access points. Record manual-clean or inspection tasks outside the automated circuit.
Connect the cleaning circuit, recipe sequence, supply and return conditions, quality release and resource cost to a reviewable CIP investment.

Start with the business outcome
A multi-SKU manufacturer needs cleaning that is appropriate for the product soils and installed circuits while fitting a realistic production plan. DPS can engineer and integrate CIP equipment, piping, valves, controls and utility interfaces. ROI depends on qualified changeover time and measured resource reductions, rather than on shortening a programmed recipe without verification.
The responsible site quality team defines cleaning validation, routine verification and product release with qualified specialists. A CIP skid specification or automation sequence by itself does not prove allergen removal, microbiological suitability or regulatory compliance.

Map fats, proteins, starches, sugars, particulates and product behavior to the equipment surfaces and access points. Record manual-clean or inspection tasks outside the automated circuit.
Define which transitions require separate procedures and verification. Sequence products where appropriate, while protecting commercial service and approved quality requirements.
Record branches, valves, tank devices, instrument connections and return paths. Supply at the skid cannot substitute for verifying the defined circuit’s conditions.
A shared CIP source may clean several circuits in sequence if the production schedule and required conditions allow it.
Review whether independent or parallel circuits address a measured scheduling or product-segregation requirement.
Compare recovery options against soil carryover, sequence, chemical monitoring and the site-approved quality basis.
Swipe horizontally to compare all columns ↔
| System | Operating duty | Relevant DPS guide | Confirm before purchase |
|---|---|---|---|
| CIP equipment | Engineered cleaning supply and return for the actual circuits. | DPS CIP systems ↗ | Circuit boundaries, duty, materials, utilities, instruments and acceptance. |
| Automation and instrumentation | Recipes, permissives, sequence visibility and agreed interfaces. | Automation & controls ↗ | I/O, operating states, alarm handling, backup, training and ownership. |
| Utility infrastructure | Source, distribution and point-of-use must meet the scheduled duty. | Utility planning ↗ | Peak simultaneity, recovery, isolation, spare capacity and contingency. |
| Process engineering | Turn a measured operating gap into an agreed design basis. | Process engineering ↗ | Representative products, drawings, duty and required acceptance evidence. |
The arithmetic below illustrates a resource-cost ledger for two transitions per day over 250 days. Quantities and rates are hypothetical. Heating energy is excluded here so it can be shown separately without double-counting.
Swipe horizontally to compare all columns ↔
| Independent resource | Reduction assumption | Unit cost | Annual amount |
|---|---|---|---|
| Fresh water and effluent | 1.2 m³/transition × 500 transitions | 5.00 USD/m³ combined site rate | 3,000 |
| Purchased cleaning chemistry | 12 kg/transition × 500 transitions | 5.00 USD/kg | 30,000 |
| Additional disposal / consumables avoided | Separate verified operating line item | Owner’s actual cost basis | 12,000 |
| Total cleaning-resource assumption | Excludes energy and payroll | Not a vendor savings claim | 45,000 |
| Verification condition | Matched soils / circuits and qualified release | Measure before and after | No automatic reduction in required cleaning duty |
Swipe horizontally to compare all columns ↔
| Observed condition | Measure before design | DPS / team decision | Economic basis |
|---|---|---|---|
| Long changeover | Log end-product, drain, rinse, wash, verification and restart. | Identify which verified stages can change and what hardware is needed. | Recovered time only becomes contribution when good output is sold. |
| High water / chemical use | Meter circuit quantities and concentration by approved sequence. | Compare measurement, control and appropriate recovery. | Actual avoided baseline purchasing and disposal, with added cost deducted. |
| Shared utility interruptions | Log supply / return conditions with overlapping requests. | Coordinate CIP and production infrastructure. | Independent utility cost saving plus verified production benefit. |
| Inconsistent execution records | Map manual settings, valve states and recipe versions. | Improve instrumentation, sequencing and operating evidence. | Real payroll or rework avoidance; no invented compliance fine benefit. |
Survey the entire supply / return circuit, instruments, valves, tank devices and manual-clean tasks. Use a qualified cleaning baseline and measured utilities before changing sequences.
Define the product / soil / transition envelope, all circuits, concurrent demand and source / return requirements before selecting a skid. Coordinate drains, utilities, access and quality responsibilities.
Compare proposals with the same product duty, supplier boundaries and acceptance basis. The amount below is a transparent planning example, not a market price range, supplier estimate or DPS quotation.
| Cost bucket | Assumed amount |
|---|---|
| Circuit audit and CIP engineering | $35,000 |
| Configured skid / valves / instruments | $160,000 |
| Supply-return and electrical installation | $70,000 |
| Controls and recipe integration | $45,000 |
| Commissioning / qualified trial support | $30,000 |
| Training and handover documents | $10,000 |
| Defined project scope | $350,000 |
| Separate site / facility additions | $40,000 |
| Capital contingency (15%) | $58,500 |
| Separate one-time startup / shutdown cost | $25,000 |
| Incremental working capital | $5,000 |
| Total initial cash | $478,500 |
The defined scope assumes applicable freight, procurement charges and taxes are included in the owner’s estimate. Add missing civil, land / shell, OEM, environmental, validation and permitting costs explicitly. Site and field conditions, duty, production access and quoted supplier scope determine actual price. Financing is excluded.
A hypothetical qualified 18-minute improvement across two daily transitions releases 0.6 hour/day. With 250 days, 1,000 good kg/h and 60% realization, the model sells 90,000 extra kg/year at $1.50/kg contribution. The cleaning-resource saving is a separate $45,000/year assumption excluding the $10,000 baseline energy saving. Only 50% of 400 released paid hours is assumed to become payroll cash.
Calculated from these assumptions: steady annual net benefit $185,200; year-one net cash $126,040; cash payback 2.90 years; five-year NPV at 10% is $169,772. Change the assumptions below to test a different case.
Replace the illustrative inputs with your own measured or quoted values. The five-year pre-tax model uses good kilograms, demand-capped contribution and separately verified baseline savings; it is not a project quotation.
All defaults are illustrative. The default case is an operating-plant improvement, not a greenfield quote. For a new operation, set baseline savings to zero and enter every additional operating and capital cost.
Includes contingency, startup and working capital
Incremental operating cash before tax
Includes year-one ramp assumption
At 10% annual discount
Net annual benefit ÷ initial cash
Net cumulative gain ÷ initial cash
Modeled incremental sales: 90,000 kg/year at $1.50/kg contribution. The base case has a nonnegative five-year NPV at the selected discount rate. Year-one net cash: $126,040.
Realization needed for the target operating payback
35.6%
Minimum capacity realization for a 4-year operating cash payback; terminal recovery excluded. Demand and unit margin must also hold.
CSV export is local. No inputs are submitted.
Swipe the chart to compare all five years ↔
Swipe horizontally to compare all columns ↔
| Year | Net cash | Cumulative cash | Discounted cash |
|---|---|---|---|
| Initial | −$478,500 | −$478,500 | −$478,500 |
| Year 1 | $126,040 | −$352,460 | $114,582 |
| Year 2 | $185,200 | −$167,260 | $153,058 |
| Year 3 | $185,200 | $17,940 | $139,144 |
| Year 4 | $185,200 | $203,140 | $126,494 |
| Year 5 | $185,200 | $388,340 | $114,995 |
Swipe horizontally to compare all columns ↔
| Case | Annual benefit | NPV | Cash payback |
|---|---|---|---|
| Downside | $131,200 | −$109,903 | 4.66 years |
| Base | $185,200 | $169,772 | 2.90 years |
| Upside | $215,200 | $275,314 | 2.54 years |
Downside: installed and site costs +20%, realization ×0.75 and unit contribution reduced by 20% of its absolute value. Upside: realization ×1.15, capped at 100%, and unit contribution improved by 10% of its absolute value. The demand ceiling still applies.
Initial cash = (defined project scope + site additions) × (1 + contingency) + separate startup / shutdown cost + working capital. Contingency is conservatively treated as spent initially.
Sold incremental kg = min(days × recovered hours/day × constrained good kg/hour × realization, incremental demand). Contribution = sold incremental kg × (net price − incremental variable cost). New-volume labor, energy and packaging belong in that variable cost.
Baseline material benefit uses the verified percentage of actual purchases avoided at unchanged accepted baseline output. It is not a direct subtraction of two loss rates. Count a recovered kilogram once, either as its applicable cash saving or as incremental contribution.
Net annual benefit = contribution + independently realized baseline cash savings − added fixed operating cost. Year one scales gross benefits by the ramp factor while paying the full added fixed operating cost. Do not also count the same launch loss in the one-time startup amount.
Cash ROI = net annual benefit / initial cash. Five-year net ROI = (five-year cash inflows − initial cash) / initial cash. NPV = −initial cash + Σ cash flow(t)/(1 + discount rate)^t. Payback uses annual cash with linear interpolation within the recovery year. The threshold solver excludes terminal working-capital recovery.
This is a five-year screening horizon, not an asset’s entire life. No tax, debt, depreciation, grants, escalation, asset resale or additional replacement capital is modeled. Include recurring service costs in operating expense and use a detailed monthly budget for formal capital approval.
Use metered energy and a verified reduction for the existing operation. This is a separate teaching example: $7,200 gross heating saving less $2,500 service cost = $4,700 net/year. The main ROI instead assumes $10,000 gross baseline energy saving and includes all annual service expense within its $12,000 added fixed cost. These two cases must not be combined. It does not alter approved cleaning conditions.
Use representative products, measured constraints and a documented utility / cleaning envelope. Assign each supplier and owner interface.
Plan FAT / SAT, instruments, recipes, permissives, quality checks and upstream / downstream handshakes as appropriate to the scope.
After stabilization, compare matched products and operating conditions. Reconcile extra output with sales, and baseline savings with actual purchases, bills and payroll.

Published scope / project context
DPS publishes configurable CIP equipment, controls and installation scope. Its CIP equipment descriptions support the service links on this page; none of the resource reductions, time changes or prices in this example are represented as achieved customer results.
Swipe horizontally to compare all columns ↔
| Decision | Targeted intervention | Broader replacement / new operation |
|---|---|---|
| Constraint | A measured gap can be corrected within retained assets. | The verified operating envelope cannot meet product, demand or reliability needs. |
| Cost scope | Include engineering, interfaces, shutdown, commissioning and retained-asset risk. | Include all new systems, site / facility work, OEMs, utilities, ramp and working capital. |
| Benefit | Only incremental contribution and genuinely avoided costs versus the current operation. | Demand-supported contribution less the full additional operating cost versus the agreed alternative. |
| Acceptance | Verify the changed duty and its effect on the complete line. | Verify the integrated new train and the owner’s readiness to operate. |
Prepare the information below, export the assumptions you have modeled, and discuss the unknowns with DPS. An unmeasured input is a question to resolve, not a reason to invent precision.
Checklist and model data stay in this browser until you choose to share them.
The DPS CIP equipment page describes configurable cleaning-system scope. Use it to start the equipment discussion, then agree the complete installed circuits, utility interfaces, control requirements and quality-verification responsibilities for your products.
Guide assumptions reviewed on 26 October 2026. Qualified site / product teams establish regulatory and food-safety requirements; this guide does not prescribe a validated process.

Specify cleaning objects, supply and return duties, product hold-up, controls and connection work before selecting food process equipment and CIP infrastructure.

Compare central and satellite CIP through circuit routing, pipe inventory, cleaning concurrency, returns and staged connections in a live food plant.

Compare utility peak capacity, sequencing and buffers using a timed load model, DPS CIP interfaces and a reported retrofit case with staged tie-ins.