Indirect process heating
Define the product heat-transfer requirement, exchanger / jacket conditions and condensate behavior through the actual load range. Nameplate source output does not establish useful heat at the vessel.
Compare source capacity, point-of-use heat transfer, steam quality, condensate return and overlapping production / CIP loads.

Start with the business outcome
A food plant can have adequate boiler capacity while a cooker or CIP user still receives unstable heat. DPS can coordinate the source-to-user duty, distribution, return, instrumentation and installation. Meter energy and process conditions before adding source capacity; the right project may correct delivery or recovery instead of purchasing another major utility package.
Qualified teams define pressure-system work, steam / water quality, direct or indirect product contact and the applicable site requirements. No universal steam pressure, boiler size or food-contact quality grade is prescribed here.

Define the product heat-transfer requirement, exchanger / jacket conditions and condensate behavior through the actual load range. Nameplate source output does not establish useful heat at the vessel.
Map circuit heating, storage, recharge and simultaneous production demand. Sequence changes must remain compatible with the qualified cleaning and production basis.
Assess return quality, drainage, contamination pathways, available heat and its receiving load. A recovery opportunity needs a qualified energy and operating balance.
Measure source, distribution, local control and return during the production constraint.
Model peaks and recovery before adding source capacity.
Select packages after duty, delivery and return conditions are established.
Swipe horizontally to compare all columns ↔
| System | Operating duty | Relevant DPS guide | Confirm before purchase |
|---|---|---|---|
| Utility supply and return | Meet the duty where the process actually uses it. | Utility infrastructure ↗ | Peak overlap, recovery, quality, point-of-use conditions and isolation. |
| Heat-transfer / hot-water package | Provide the qualified heating and recovery duty. | Process engineering ↗ | Thermal envelope, materials, return, quality and pressure responsibilities. |
| Instrumentation and controls | Execute the agreed sequence and record meaningful equipment states. | Automation & controls ↗ | I/O, alarms, recipe authority, backups and acceptance tests. |
| OEM and field interfaces | Connect the selected equipment to the existing operating train. | Installation & integration ↗ | Mechanical, electrical, software, site access and integrated acceptance. |
Use qualified thermal, hydraulic and pressure-system calculations; these questions organize the assessment rather than replace design.
Swipe horizontally to compare all columns ↔
| Decision | What to compare | Acceptance evidence |
|---|---|---|
| Source | Peak demand, recovery, condition and future duty | Required delivery at agreed concurrent loads. |
| Distribution / user | Control, losses, exchanger / jacket and return behavior | Stable point-of-use conditions over load range. |
| Recovery | Available heat, receiving load, quality and timing | Measured net avoided purchased energy. |
Swipe horizontally to compare all columns ↔
| Observed condition | Measure before design | DPS / team decision | Economic basis |
|---|---|---|---|
| Slow heating | Trend user and return conditions. | Correct verified source / delivery cause. | Useful good output only with demand and downstream availability. |
| High purchased energy | Meter matched production and schedule. | Evaluate suitable recovery / controls. | Actual avoided baseline energy spend. |
| CIP thermal conflict | Map overlapping duties and recharge. | Compare storage, sequence and source. | Independent resource and useful time effects. |
| Unclear steam quality | Define product-contact / utility boundaries. | Use qualified specification and assessment. | Required operating fit; no invented fines or certification benefit. |
Meter the user under the real constraint and assess delivery / condensate before a larger source. Separate heating delay from product-required residence.
Build source, distribution, return and peak / recovery load lists from the production / CIP calendar. Include qualified package work, water treatment interfaces, installation and service costs.
Compare proposals with the same product duty, supplier boundaries and acceptance basis. The amount below is a transparent planning example, not a market price range, supplier estimate or DPS quotation.
| Cost bucket | Assumed amount |
|---|---|
| Application engineering and supplier duty review | $42,000 |
| Defined equipment / instrumentation components | $151,000 |
| Mechanical and electrical field installation | $77,000 |
| Controls and interface development | $46,000 |
| Commissioning / agreed acceptance support | $20,000 |
| Training, documentation and handover | $14,000 |
| Defined project scope | $350,000 |
| Separate site / facility additions | $50,000 |
| Capital contingency (15%) | $60,000 |
| Separate one-time startup / shutdown cost | $30,000 |
| Incremental working capital | $5,000 |
| Total initial cash | $495,000 |
The defined scope assumes applicable freight, procurement charges and taxes are included in the owner’s estimate. Add missing civil, land / shell, OEM, environmental, validation and permitting costs explicitly. Site and field conditions, duty, production access and quoted supplier scope determine actual price. Financing is excluded.
Hypothetical screening case: 250 days × 0 equivalent useful hour/day × 0 accepted kg/h × 0% realization, capped at 0 kg incremental demand, gives 0 additional sold kg/year. Net price $0/kg less incremental variable cost $0/kg gives $0/kg contribution. Verified baseline purchase savings are $0, realized payroll savings $0, energy $75,000, cleaning resources $0 and maintenance $10,000 per year. Deduct $10,000 additional annual fixed cost. The default is an energy-led utility case without additional sales. Any independent capacity benefit requires a complete-line production and demand basis.
Calculated from these assumptions: steady annual net benefit $75,000; year-one net cash $45,250; cash payback Beyond 5 years; five-year NPV at 10% is −$237,736. Change the assumptions below to test a different case.
Replace the illustrative inputs with your own measured or quoted values. The five-year pre-tax model uses good kilograms, demand-capped contribution and separately verified baseline savings; it is not a project quotation.
All defaults are illustrative. The default case is an operating-plant improvement, not a greenfield quote. For a new operation, set baseline savings to zero and enter every additional operating and capital cost.
Includes contingency, startup and working capital
Incremental operating cash before tax
Includes year-one ramp assumption
At 10% annual discount
Net annual benefit ÷ initial cash
Net cumulative gain ÷ initial cash
Modeled incremental sales: 0 kg/year at $0.00/kg contribution. The base case does not recover the required discounted return within five years. Year-one net cash: $45,250.
Realization needed for the target operating payback
Not feasible
Demand, time, contribution or other cash benefits cannot meet the 4-year target under these assumptions.
CSV export is local. No inputs are submitted.
Swipe the chart to compare all five years ↔
Swipe horizontally to compare all columns ↔
| Year | Net cash | Cumulative cash | Discounted cash |
|---|---|---|---|
| Initial | −$495,000 | −$495,000 | −$495,000 |
| Year 1 | $45,250 | −$449,750 | $41,136 |
| Year 2 | $75,000 | −$374,750 | $61,983 |
| Year 3 | $75,000 | −$299,750 | $56,349 |
| Year 4 | $75,000 | −$224,750 | $51,226 |
| Year 5 | $75,000 | −$149,750 | $46,569 |
Swipe horizontally to compare all columns ↔
| Case | Annual benefit | NPV | Cash payback |
|---|---|---|---|
| Downside | $75,000 | −$329,736 | Beyond 5 years |
| Base | $75,000 | −$237,736 | Beyond 5 years |
| Upside | $75,000 | −$237,736 | Beyond 5 years |
Downside: installed and site costs +20%, realization ×0.75 and unit contribution reduced by 20% of its absolute value. Upside: realization ×1.15, capped at 100%, and unit contribution improved by 10% of its absolute value. The demand ceiling still applies.
Initial cash = (defined project scope + site additions) × (1 + contingency) + separate startup / shutdown cost + working capital. Contingency is conservatively treated as spent initially.
Sold incremental kg = min(days × recovered hours/day × constrained good kg/hour × realization, incremental demand). Contribution = sold incremental kg × (net price − incremental variable cost). New-volume labor, energy and packaging belong in that variable cost.
Baseline material benefit uses the verified percentage of actual purchases avoided at unchanged accepted baseline output. It is not a direct subtraction of two loss rates. Count a recovered kilogram once, either as its applicable cash saving or as incremental contribution.
Net annual benefit = contribution + independently realized baseline cash savings − added fixed operating cost. Year one scales gross benefits by the ramp factor while paying the full added fixed operating cost. Do not also count the same launch loss in the one-time startup amount.
Cash ROI = net annual benefit / initial cash. Five-year net ROI = (five-year cash inflows − initial cash) / initial cash. NPV = −initial cash + Σ cash flow(t)/(1 + discount rate)^t. Payback uses annual cash with linear interpolation within the recovery year. The threshold solver excludes terminal working-capital recovery.
This is a five-year screening horizon, not an asset’s entire life. No tax, debt, depreciation, grants, escalation, asset resale or additional replacement capital is modeled. Include recurring service costs in operating expense and use a detailed monthly budget for formal capital approval.
Use consistently converted purchased fuel / thermal energy in kWh and its matching tariff. Defaults give $75,000 gross annual energy savings, matching the main model; added service is in its $10,000 fixed-cost input.
Use representative products, measured constraints and a documented utility / cleaning envelope. Assign each supplier and owner interface.
Plan FAT / SAT, instruments, recipes, permissives, quality checks and upstream / downstream handshakes as appropriate to the scope.
After stabilization, compare matched products and operating conditions. Reconcile extra output with sales, and baseline savings with actual purchases, bills and payroll.

Published scope / project context
DPS publishes process engineering, configured equipment, controls and installation / integration services. The source links establish relevant scope. The amounts, time changes, resource reductions and returns here are original hypothetical inputs, not achieved DPS customer results.
Swipe horizontally to compare all columns ↔
| Decision | Targeted intervention | Broader replacement / new operation |
|---|---|---|
| Constraint | A measured gap can be corrected within retained assets. | The verified operating envelope cannot meet product, demand or reliability needs. |
| Cost scope | Include engineering, interfaces, shutdown, commissioning and retained-asset risk. | Include all new systems, site / facility work, OEMs, utilities, ramp and working capital. |
| Benefit | Only incremental contribution and genuinely avoided costs versus the current operation. | Demand-supported contribution less the full additional operating cost versus the agreed alternative. |
| Acceptance | Verify the changed duty and its effect on the complete line. | Verify the integrated new train and the owner’s readiness to operate. |
Prepare the information below, export the assumptions you have modeled, and discuss the unknowns with DPS. An unmeasured input is a question to resolve, not a reason to invent precision.
Checklist and model data stay in this browser until you choose to share them.
Spirax Sarco discusses steam quality and contamination pathways in food and beverage systems. Qualified project teams determine the actual steam, pressure-system and product-contact requirements.
Guide assumptions reviewed on 26 October 2026. Qualified site / product teams establish regulatory and food-safety requirements; this guide does not prescribe a validated process.

Define a food plant utility design basis using operating events, simultaneous peaks, supply conditions, future capacity and clear package interfaces.

Compare utility peak capacity, sequencing and buffers using a timed load model, DPS CIP interfaces and a reported retrofit case with staged tie-ins.

Confirm utility availability before buying land: required conditions, provider evidence, connection scope, upgrade responsibilities and decision deadlines.