Clear Broths and Stocks
Define extraction or blending duty, fat handling, filtration interfaces, holding conditions and the package. A low-viscosity liquid can still create sanitation, foaming and transfer constraints.
Bring cooking, cooling, transfer and cleaning together around your recipes. DPS helps define the process, specify equipment and coordinate the line from design through startup.
Discuss Your Project

Define extraction or blending duty, fat handling, filtration interfaces, holding conditions and the package. A low-viscosity liquid can still create sanitation, foaming and transfer constraints.
Track viscosity as ingredients hydrate and temperature changes. Compare mixing, wall contact, fouling, cooling and discharge across the full batch rather than the finished sample alone.
Specify the largest piece, solids loading and the required texture after cooking, pumping and filling. The pump and valve passages must be reviewed with the package and heat-treatment route.
Link cooking, cooling, transfer and chilled distribution to a qualified product-specific process. Avoid unapproved waiting between cook, cool and pack.
Compare retort and aseptic processing with qualified specialists based on product, particulates, package and the required process. Determine what is pre-cooked and where the final process occurs.
Model the complete cook-room schedule across loading, cooking, cooling, discharge and cleaning. Review which tasks can safely overlap.
Review the complete cook room together, including the equipment before and after each vessel.
Batch heating, cooking and mixing, with cooling and discharge matched to the operating duty.
Coordinate holding, temperature and sanitary transfer between batch operations.
Define cleaning circuits, return conditions and peak utility requirements for the installed line.
Swipe horizontally to compare all columns ↔
| System | Operating duty | Relevant DPS guide | Confirm before purchase |
|---|---|---|---|
| Jacketed kettle | Batch heating, cooking, mixing and discharge. | DPS kettles & cookers ↗ | Working batch, agitation, heat-transfer duty, cooling and discharge. |
| Staging / buffer tanks | Separate batch operations where the product permits holding. | DPS tanks and vessels ↗ | Permitted residence, temperature, agitation and cleaning. |
| CIP system | Serve the complete vessel / piping circuit. | DPS CIP systems ↗ | Product soils, return conditions, peak utilities and verification. |
| Particulate / thermal / filling packages | Specialist package-process duties. | Process engineering ↗ | Define OEM performance and package / process review requirements. |
Start with the business outcome
Soup and broth manufacturers need a coordinated process rather than a cooker selected by nominal volume. DPS can connect kettle duty, ingredient additions, heat transfer, sanitary transfer, controls, cleaning and packaging interfaces. A useful business case values conforming output at contribution margin and includes the cost of utilities, installation, changeovers and startup.
DPS publishes kettle applications for soups and prepared-food bases. Cooking vessels, tanks, CIP and integration must be specified to the actual duty. Retorts, aseptic systems, fillers and specialist particulate equipment require explicit OEM scope and qualified process review.
Agree broth or blend preparation, viscosity through the batch, largest pieces, solids loading and the required texture after packaging.
Measure charging, heating, mixing, cooling, discharge and waiting with representative recipes and actual utility delivery.
Check particle integrity through pumps and valves, filler availability, qualified recipe transitions and accepted output per complete batch.

Review the scope, cost assumptions and operating case for your project. The examples and calculators below support early planning and are not DPS quotations.
Begin with the cycle log and the product envelope. Check the existing kettle, agitator, outlet, pump, heat source, cooling system and filler together. Preserve assets that meet the verified duty and define the shutdown and restart sequence.
Build the SKU and packaging mix first. Establish product / process authority review, ingredient handling, cooking and cooling arrangement, hygienic zones, waste handling, utilities, staffing and planned demand.
Swipe horizontally to compare all columns ↔
| Observed condition | Measure before design | DPS / team decision | Economic basis |
|---|---|---|---|
| Long cook-room cycle | Measure charging, heating, cooling, discharge and waiting independently. | Target the limiting step and compare alternative batch sizes. | Complete good batches × saleable kg; do not monetize theoretical fractional batches. |
| Damaged pieces or rework | Sample quality after agitation, transfer and the filler. | Coordinate mixing energy, passages and transfer method. | Use verified avoided baseline purchases or rework cost; exclude extra volume already valued in contribution. |
| Unbalanced cook and fill | Trend blocked cookers and starved fillers by package. | Review buffer requirements, thermal holds and scheduling. | Incremental sold kg at net contribution, capped by downstream and commercial demand. |
| Cleaning consumes the shift | Map recipe / allergen changes and full installed CIP circuits. | Coordinate circuit sequence, utilities and quality release. | Recovered time plus independently metered resource savings. |
Swipe horizontally to compare all columns ↔
| Decision | Targeted Work | Broader Scope |
|---|---|---|
| Cooking Capacity | Correct the measured cook, cool or discharge constraint. | Add kettle capacity using complete cycles rather than nominal vessel volume. |
| Pieces and Texture | Trial agitation, passages and sanitary transfer. | Reconfigure packages where the product envelope exceeds retained equipment. |
| Shift Availability | Coordinate filler readiness, cleaning circuits and release. | Expand supporting utilities or package capacity after measuring the limiting stage. |
Compare proposals with the same product duty, supplier boundaries and acceptance basis. The amount below is a transparent planning example, not a market price range, supplier estimate or DPS quotation.
| Cost bucket | Assumed amount |
|---|---|
| Engineering and cook-room schedule | $45,000 |
| Configured vessels / process components | $185,000 |
| Mechanical / electrical installation | $80,000 |
| Recipe and controls integration | $45,000 |
| Commissioning / product trials | $30,000 |
| Training and closeout | $15,000 |
| Defined project scope | $400,000 |
| Separate site / facility additions | $50,000 |
| Capital contingency (15%) | $67,500 |
| Separate one-time startup / shutdown cost | $25,000 |
| Incremental working capital | $20,000 |
| Total initial cash | $562,500 |
The defined scope assumes applicable freight, procurement charges and taxes are included in the owner’s estimate. Add missing civil, land / shell, OEM, environmental, validation and permitting costs explicitly. Site and field conditions, duty, production access and quoted supplier scope determine actual price. Financing is excluded.
Illustrative complete-batch basis: a 720-minute window with 180-minute current cycles completes 4 batches; 144-minute proposed cycles complete 5. At 900 good kg/batch this releases 900 kg/day, equivalent to 1 modeled productive hour at 900 good kg/h, rather than one directly saved clock hour. × 250 days × 65% realization = 146,250 additional sold kg/year. At $3.50/kg price less $2.15/kg variable cost, annual capacity contribution is $197,437.50. Labor cash savings are only the approved avoided paid hours; extra-volume labor already belongs in variable cost.
Calculated from these assumptions: steady annual net benefit $221,188; year-one net cash $137,472; cash payback 2.92 years; five-year NPV at 10% is $199,870. Change the assumptions below to test a different case.
Assumed new soup / broth operation: ingredient handling / batching equipment, configured cook-room / transfer equipment, the selected specialist preservation / filling package, utilities, engineering, controls, installation and commissioning are included in $2.4M. The $1.1M site allowance represents the separate assumed facility fit-out boundary. The package and qualified route must be fixed before requesting actual prices.
The $850,000 additional annual fixed cost assumes $550,000 fixed payroll / supervision, $200,000 occupancy and overhead, and $100,000 service / other fixed operation. Incremental product and production costs are already in $2.15/kg variable cost.
| Owner-budget item | Assumed or calculated amount |
|---|---|
| Defined equipment / engineering / installation scope | $2,400,000 |
| Separate site / facility allowance | $1,100,000 |
| Capital contingency (15%) | $525,000 |
| One-time pre-production startup expense | $125,000 |
| Incremental working capital | $250,000 |
| Total initial cash | $4,400,000 |
| Steady sold good output | 1,478,750 kg/year |
| Additional fixed operating cost | $850,000/year |
| First-year gross-benefit realization | 45% |
| First-year net operating cash | $48,341 |
| Steady net annual cash | $1,146,313 |
| Five-year NPV at 10% | −$1,052,730 |
Scheduled capacity is 250 days × 7 hours/day × 1,300 good kg/h; 65% realization and the 1,500,000 kg demand ceiling determine sold output. Historical material, payroll, energy, cleaning and maintenance savings are all zero. Startup expense covers separate pre-production activities; the year-one ramp already models unrealized gross operating benefit. Do not charge the same launch loss twice.
Use the New-facility example button below to inspect and change all assumptions. A negative NPV is a reason to revisit scope, utilization, contribution, timing or the decision horizon; it is not hidden by forcing a faster payback.
Replace the illustrative inputs with your own measured or quoted values. The five-year pre-tax model uses good kilograms, demand-capped contribution and separately verified baseline savings; it is not a project quotation.
Both presets are hypothetical owner-budget scenarios. Choose the existing-plant improvement or new-facility case; they have different cost boundaries. New-facility presets set all historic savings to zero and include additional fixed operating cost.
Includes contingency, startup and working capital
Incremental operating cash before tax
Includes year-one ramp assumption
At 10% annual discount
Net annual benefit ÷ initial cash
Net cumulative gain ÷ initial cash
Modeled incremental sales: 146,250 kg/year at $1.35/kg contribution. The base case has a nonnegative five-year NPV at the selected discount rate. Year-one net cash: $137,472.
Realization needed for the target operating payback
62.8%
Minimum capacity realization for a 3-year operating cash payback; terminal recovery excluded. Demand and unit margin must also hold.
CSV export is local. No inputs are submitted.
Swipe the chart to compare all five years ↔
Swipe horizontally to compare all columns ↔
| Year | Net cash | Cumulative cash | Discounted cash |
|---|---|---|---|
| Initial | −$562,500 | −$562,500 | −$562,500 |
| Year 1 | $137,472 | −$425,028 | $124,974 |
| Year 2 | $221,188 | −$203,841 | $182,800 |
| Year 3 | $221,188 | $17,347 | $166,181 |
| Year 4 | $221,188 | $238,534 | $151,074 |
| Year 5 | $221,188 | $459,722 | $137,340 |
Swipe horizontally to compare all columns ↔
| Case | Annual benefit | NPV | Cash payback |
|---|---|---|---|
| Downside | $142,213 | −$177,879 | Beyond 5 years |
| Base | $221,188 | $199,870 | 2.92 years |
| Upside | $246,500 | $287,770 | 2.66 years |
Downside: installed and site costs +20%, realization ×0.75 and unit contribution reduced by 20% of its absolute value. Upside: realization ×1.15, capped at 100%, and unit contribution improved by 10% of its absolute value. The demand ceiling still applies.
Hold batch quality, recipe and filling access constant. Include loading, cooking, cooling, discharge and recurring cleaning in each full cycle. Only complete batches are counted. Defaults support the main model: one additional 900 kg batch per day, then 65% realization over 250 days. The main ROI hour is an equivalent capacity representation. This operating worksheet refers to the existing-plant example and is independent of the financial preset selected above.
Prepare the information below, export the assumptions you have modeled, and discuss the unknowns with DPS. An unmeasured input is a question to resolve, not a reason to invent precision.
Checklist and model data stay in this browser until you choose to share them.

Design a ready-meal operation around component cooking, assembly, cooling and distribution, with explicit release gates and equipment interfaces.

Plan a food processing plant layout around product, people, packaging and waste flows, then test space, access, storage and future expansion.

Plan food processing and packaging as one path. Compare rates, batch presentation, buffers, interfaces and staged capacity before selecting equipment.
Discuss a new line, a cook-room upgrade or a specific production constraint with DPS.