Engineered to Be Profitable, Built to Last.
A fully integrated Design-Build-Manage practice for food and beverage manufacturers — spanning capital strategy, process engineering, installation, and commissioning under one accountable team.
Design. Build. Manage.
One unified framework that collapses engineering, construction, and operations into a single accountable process — so projects move faster, reduce rework, and launch profitable from day one.
Design
In-house and vetted partner engineering translates business goals into buildable, operable systems — every design choice traced to a measurable business outcome.
- Process & mechanical design
- Controls & automation layer
- Structural, plumbing & electrical
Build
DPS acts as your General Contractor, managing local trades, equipment vendors, and installation teams under a single chain of accountability.
- General contracting in 50 states
- Trade & subcontractor oversight
- Single-source accountability
Manage
Execution overseen with operational rigor. Every vendor — and DPS itself — is held to an exceptional standard. Your success is our only definition of success.
- End-to-end program management
- Risk & change control
- Startup & commissioning
Full-Lifecycle Capability, End-to-End Ownership.
From the earliest feasibility conversation to the final commissioning walkthrough, DPS delivers every function required to bring a food or beverage facility to life — under a single point of accountability.
Process Engineering & System Design
Custom system design informed by deep domain expertise across fermentation, thermal, aseptic, and protein systems.
Capital Planning & Feasibility
Strategic project evaluation and portfolio planning — before capital is committed and risks become sunk cost.
Owner’s Representative Services
We represent and protect your interests across the entire project lifecycle — standing guard between you and the vendors.
Project & Program Management
End-to-end execution and coordination. Our PMs drive schedule, scope, and stakeholder alignment with operational discipline.
General Contracting Services
DPS serves as your GC where licensed, and provides all GC functions elsewhere — coordinating every trade on site.
Equipment Manufacturing & Supply
DPS-branded process equipment — tanks up to 12K gal, CIP systems, marinating tumblers, and cooking retorts.
Installation & System Integration
Complete physical installation — utilities, process, controls, and commissioning — without the finger-pointing.
Need A Service That Spans Multiple Disciplines?
Complex projects rarely fit a single bucket. Talk to us — we’ll scope a tailored engagement across any combination of the seven.
Equal Depth Across Food & Beverage.
A roughly 50/50 workload split across our two divisions — each anchored by dedicated subject matter experts and backed by the full DPS capability set. From craft beverage to animal protein, prepared foods to aseptic dairy, we bring proven playbooks and operator-grade judgment.
We also support pharmaceutical-adjacent applications where sanitary design, aseptic systems, and FDA/USDA/SQF/BRC compliance pathways intersect.
See Industries We Serve →Sanitary Equipment Built To Integrate Seamlessly.
DPS produces and supplies its own branded process equipment, engineered to integrate with the systems we deliver — eliminating the classic interface problems between equipment vendor and installation team.
Our line includes process tanks up to 12,000 gallons, CIP systems, marinating tumblers, and cooking retorts. Equipment sales represent roughly 5% of total revenue today and are projected to grow significantly as we open the line beyond existing DPS clients.
A Greenfield Beverage Co-Packing Facility.
DPS is currently leading the design and installation of a new beverage co-packing facility engineered for maximum production and repackaging flexibility. Our scope spans the syrup room, boilers, air compressors, cooling towers, and the full suite of plant utilities.
Beyond engineering, we’re deeply embedded in shaping the client’s business model — ensuring the facility is profitable from year one in an intensely competitive category. This project exemplifies the DPS method: identify the real problem, design a solution that fits, and guide the client to both immediate and sustainable success.
- Full utilities scope
Let’s Build Something Profitable, Together.
Whether you’re planning a greenfield facility, expanding capacity, or facing an operational disruption that needs to be solved yesterday — we’d like to understand the problem before recommending a solution.
