Case Studies
Explore how DPS has delivered profitable, on-time, and on-budget projects for food and beverage manufacturers across the United States and Canada.
Start Your Project →
Real Projects, Real Results.
Each case study reflects the DPS Design-Build-Manage methodology — single-point accountability, rigorous execution, and measurable outcomes for our clients.
Golden West Food Group — Co-Packing Plant Relocation
DPS relocated a value-added food processing operation from Los Angeles to Fort Worth — securing permits, managing cross-country machinery relocation, and commissioning the new facility in just 10 weeks with zero supply chain disruptions or customer delivery gaps.
Ground Beef Line Execution — Confidential Client
DPS delivered a high-volume ground beef processing line inside an active Los Angeles facility — engineering all disciplines in 4 weeks, managing 12 subcontractors, and activating early production by Week 11 to capture peak season revenue for a leading meat processor.
Albertsons — CIP System & Air Farm Upgrade
DPS replaced aging CIP assets and pneumatic air farm infrastructure at a high-volume Albertsons facility — executing all tie-ins across three brief planned outages using offsite prefabrication and minute-by-minute execution checklists, on budget and ahead of schedule.
Albertsons Phoenix — Ice Cream Plant Upgrade
DPS coordinated the simultaneous installation of four critical infrastructure systems — air compressor, dairy processing equipment, CIP, and refrigeration — within a single Sunday evening sanitation window at Albertsons’ Phoenix ice cream plant, with production resuming Monday morning at full capacity.
Confidential Client — Pie Bakery Facility Overhaul
DPS delivered a full facility overhaul of an active pie bakery — replacing refrigeration, piping, underground plumbing, and electrical systems within a non-negotiable one-month outage window through multi-trade coordination in a highly congested production environment.
Ready to Build Your Next Project?
From greenfield facilities to targeted upgrades, DPS delivers honest, rigorous engineering and construction management. Let’s discuss how we can help you achieve your goals.
