✓ CASE STUDY • BAKERY / FOOD MANUFACTURING

Confidential Client

Pie bakery facility overhaul completed in one month

Zero schedule overruns • Highly congested environment. All operations continued with flawless coordination and complex system overhauls in a non-negotiable schedule.

Active Pie Bakery Operation • Strict 1-Month Window
1 MONTH OUTAGE • ZERO SLIPS
PXL 20230125 184727975 img
COMPLETED IN
1 Month
📍
Active Pie Bakery Operation
Highly congested production floor
✓
Multi-Trade Coordination
Underground plumbing & refrigeration
⏱
Strict 1-Month Window
Non-negotiable outage schedule
⚡
Zero Schedule Overruns
Perfect timeline compliance

Full Facility Overhaul in a Congested Bakery – On Time, Every Time.

⏱
1 month
Outage Window
Delivered perfectly on time
🏗
Multi
Trade Coordination
Seamless process pipelines management
⚡
0
Schedule Slips
No delays or timeline margins
★
High
Congestion Floor
Active bakery running parallelly

Complete a Full Facility Overhaul in a Highly Congested, Active Pie Bakery — Within a Strict One-Month Outage Window.

The client needed to overhaul refrigeration, piping, underground plumbing, and electrical systems in a busy pie production facility with extremely limited space and a non-negotiable one-month schedule.

Any delay would impact seasonal production. The project required complex multi-trade coordination in a congested environment with zero flexibility on the timeline.

! Key Constraints
  • Strict 1-month outage window
  • Highly congested active bakery
  • Complex underground plumbing & refrigeration
  • Zero tolerance for schedule overruns
↳ DPS Solution

Full multi-trade coordination of refrigeration, piping, underground plumbing, and electrical systems. Precise planning and execution delivered the complete overhaul within the tight one-month window with zero overruns.

Design • Build • Manage – Executed in a Congested Environment

D
Stage One

DESIGN

Detailed planning for refrigeration, piping, underground plumbing, and electrical systems in a highly congested space. Full multi-trade coordination strategy developed to meet the strict one-month deadline.

B
Stage Two

BUILD

Precise execution of all systems in an active pie bakery. Complex underground plumbing and refrigeration work completed while maintaining operational continuity where possible.

M
Stage Three

MANAGE

Intense multi-trade coordination with daily oversight to ensure every trade stayed on schedule. Real-time adjustments delivered the project with zero overruns in a congested environment.

EXECUTION TIMELINE

One Month. Highly Congested. Zero Overruns.

Completed on schedule in active bakery
WEEKS 1-2

Planning & Mobilization

Detailed multi-trade coordination plan. Refrigeration, piping, underground plumbing, and electrical systems prepared for congested-space execution.

WEEKS 2-3

Refrigeration & Piping

Complex refrigeration and piping systems installed in highly congested areas while bakery operations continued where possible.

WEEK 3-4

Underground Plumbing & Electrical

Underground plumbing and full electrical coordination executed with precision in tight spatial constraints.

FINAL WEEK

Integration & Commissioning

All systems integrated and tested. Final adjustments completed to meet the strict one-month deadline.

ON TIME 🎉

Project Complete

Full facility overhaul delivered with zero schedule overruns in a highly congested active pie bakery.

CLIENT VOICE
“DPS delivered our complete facility overhaul in a highly congested pie bakery within the strict one-month window with zero overruns. Their multi-trade coordination was exceptional.”
👤
Operations Director Confidential Client — Pie Bakery
IMPACT HIGHLIGHTS
Outage window 1 month (on time)
Schedule overruns Zero
Environment Highly congested active bakery

Need a Complex Facility Overhaul delivered on a Tight Schedule?

Let’s discuss how DPS can execute your next bakery or food manufacturing retrofit with the same precision and zero-overrun commitment.

We respond within 4 business hours • All information is confidential